1998-11-13 studio floor plan
1998-12-18 carpenter dave, cutting trusses
1998-12-18 foreman jack climbing the trusses (1)
1998-12-20 a view from the back woods
1998-12-20 inside view of the truss roofing (1)
1998-12-27 framed walls 1
1998-12-27 framed walls 2
1999-01-15 electric lady closet
1999-01-15 foreman jack sweeping the deck
1999-01-15 tyler, drywalling
1999-01-30 bathroom, airlock, cr from above, copper line to humidifier
1999-01-30 brickwork, from the driveway
1999-01-30 brickwork, from the side
1999-01-30 crawl space, suspended ceiling of control room
1999-01-30 drywall, main hvac return & supply
1999-01-30 gas furnace suspended, drain pan for central humidifier
1999-01-30 main hvac return & supply
1999-02-01 attic, working the flex duct
1999-02-01 bricklayer 2
1999-02-01 bricklayer, back wallJPG
1999-02-01 bricklayer, side wall
1999-02-01 cutting sheetrock for ceiling, dave
1999-02-01 under the furnace to get to ductwork
1999-02-03 cloud construction
1999-02-04 butch working on the cloud
1999-02-04 the cloud
1999-02-06 bass trap and soffit framing
1999-02-06 bulkhead and soffit framing
1999-02-08 laying the floor, butch 1
1999-02-08 laying the floor, dave 1
1999-02-08 laying the floor, jack 1
1999-02-08 laying the floor, tom
1999-02-12 control room floor troughs for wires
1999-02-12 detail of walls and floor
1999-02-12 pile of solid maple trim
1999-02-13 control room cloud w hvac flex duct
1999-02-13 hammering dave
1999-02-13 jack working the sliding glass doors 1
1999-02-17 column into iso booth
1999-02-17 control room window from ladder in studio
1999-02-17 mike from snyder electric
1999-02-17 painter working the soffit trim
1999-02-17 skip warrington, designer, working on fiberglass sills
1999-02-17 soffit and trap from top
1999-02-17 studio wall bass trap framing
1999-02-19 fluss flooring, cutting bathroom tiles
1999-02-19 front step, just after pouring concrete
1999-02-19 hvac pad and gas line